Re-engineering through pre-assembly: client expectations and drivers

Pre-assembly is an important facet of the strategy to re-engineer construction. It can be categorized as: modular building; volumetric pre-assembly, non-volumetric pre-assembly and component manufacture/subassembly. This paper presents the results of an interview survey of major construction clients...