An analysis of shift class design problems
In this paper we consider a generalization of the Fixed Job Schedule Problem (FJSP) which appears in the aircraft maintenance process at an airport. A number of jobs must be carried out where each job requires processing from a fixed time to a fixed finish time. These jobs must be carried out by a n...
Saved in:
Published in: | European journal of operational research 1994-12, Vol.79 (3), p.417-430 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In this paper we consider a generalization of the Fixed Job Schedule Problem (FJSP) which appears in the aircraft maintenance process at an airport. A number of jobs must be carried out where each job requires processing from a fixed time to a fixed finish time. These jobs must be carried out by a number of machines which are available in specific shifts only. The jobs must be carried out in a non-preemptive way, although at the end of a shift preemption of a job is allowed sometimes. The problem is to choose the number of machines in each of the shifts in such a way that all jobs can be carried out and that the total costs of the machines or the total number of machines are minimum. In this paper we present an analysis of the computational complexity of these problems. We also analyse the worst case behaviour of the preemptive variant versus the non-preemptive variant. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/0377-2217(94)90056-6 |