An adaptive crashing policy for stochastic time-cost tradeoff problems
We consider a stochastic time-cost tradeoff problem that determines how much to crash activities with the purpose of minimizing the expected summation of crashing and tardiness costs. We propose a threshold policy that makes a crashing decision contingent on a project׳s current status; crashing an a...
Saved in:
Published in: | Computers & operations research 2015-11, Vol.63, p.1-6 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | We consider a stochastic time-cost tradeoff problem that determines how much to crash activities with the purpose of minimizing the expected summation of crashing and tardiness costs. We propose a threshold policy that makes a crashing decision contingent on a project׳s current status; crashing an activity to compensate delayed starting time from a predetermined threshold. First, we present a dynamic programming (DP) formulation to find the threshold values, and prove that the resulting threshold policy is optimal for a serial-graph project. Since the above optimality does not hold generally, we develop a DP-based procedure to construct a threshold policy for arbitrary-graph projects.
We show through the computational experiments that our threshold policy is rapidly constructed by this procedure, and its cost is not very far from the theoretical lower bound.
•We consider a stochastic time-cost tradeoff problem.•We present a dynamic programming (DP) formulation for the adaptive threshold policy.•We show that the policy is optimal for a serial-graph project.•We develop a heuristic for arbitrary-graph projects.•We verify through the computational experiments that the heuristic is better than the previous heuristics. |
---|---|
ISSN: | 0305-0548 1873-765X 0305-0548 |
DOI: | 10.1016/j.cor.2015.04.021 |