Loading…

Penile prosthetic infection: management by delayed and immediate salvage techniques

Objectives. A retrospective review was performed to determine success rates using explantation plus delayed (3 days) versus immediate reimplantation in managing an infected penile prosthesis. Methods. During a 9-year period, 41 patients who presented with an infected penile prosthesis underwent a sa...

Full description

Saved in:
Bibliographic Details
Published in:Urology (Ridgewood, N.J.) N.J.), 1998-08, Vol.52 (2), p.287-290
Main Author: Knoll, L.Dean
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Objectives. A retrospective review was performed to determine success rates using explantation plus delayed (3 days) versus immediate reimplantation in managing an infected penile prosthesis. Methods. During a 9-year period, 41 patients who presented with an infected penile prosthesis underwent a salvage procedure. Group A (n = 31) underwent a delayed salvage procedure and group B (n = 10) underwent an immediate salvage procedure. Results. Successful salvage occurred in 71% in group A (delayed) and 80% in group B (immediate). Follow-up ranged from 30 to 108 months in group A and 5 to 16 months in group B. Analysis showed no statistically significant difference between the two treatment groups ( P = 0.58). Failed salvage procedures were managed with device explantation and later reimplantation at 4 to 6 months. Conclusions. In proper patient selection, immediate salvage appears as successful as delayed salvage procedures. Significant savings of healthcare dollars can be realized by an immediate salvage procedure if success rates prevail with longer term follow-up.
ISSN:0090-4295
1527-9995
DOI:10.1016/S0090-4295(98)00187-3