Loading…

Identification of infrastructure related risk factors, Deliverable 5.1 of the H2020 project SafetyCube

The present Deliverable (D5.1) describes the identification and evaluation of infrastructure related risk factors. It outlines the results of Task 5.1 of WP5 of SafetyCube, which aimed to identify and evaluate infrastructure related risk factors and related road safety problems by (i) presenting a t...

Full description

Saved in:
Bibliographic Details
Main Authors: Ashleigh Filtness, Eleonora Papadimitriou, B. Leskovsek, N. Focant, Heike Martensen, V. Sgarra, D. Shingo Usami, A. Soteropoulos, S. Stadlbauer, Athanasios Theofilatos, George Yannis, A. Ziakopoulos, K. Diamandouros, C. Durso, Charles Goldenbeld, B. Loenis, G. Schermers, J.-H. van Petegem, R. Elvik, I.S. Hesjevoll, Claire Quigley, Evita Papazikou
Format: Default Report
Published: 2016
Subjects:
Online Access:https://hdl.handle.net/2134/23759
Tags: Add Tag
No Tags, Be the first to tag this record!