Expansions in a concrete dam with bridge over spillway in South America
A gravity concrete dam built 61 years ago in South America is diagnosed due to the cracking and signs of deterioration detected in the spillway and other elements. Besides the interest to identify the causes, the authorities are concerned by the structural effects on the concrete slab road bridge th...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Default Conference proceeding |
| Published: |
2017
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/2134/32324 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|