Towards adaptable buildings: pre-configuration and re-configuration - two case studies

The future is uncertain – the present must be adaptable. The Loughborough University IMCRC Building Brands pilot project has shown that optimum built environment solutions, whether branded or not, must be adaptable. In other words they must be able to be changed over their life cycle to adapt to cha...

Full description

Saved in:
Bibliographic Details
Main Authors: Alistair Gibb, Simon Austin, Andrew Dainty, Nigel Davison, Christine L. Pasquire
Format: Default Conference proceeding
Published: 2007
Subjects:
Online Access:https://hdl.handle.net/2134/5056
Tags: Add Tag
No Tags, Be the first to tag this record!