Loading…

Modular assembly with postponement to improve health, safety, and productivity in construction

This paper presents the outcome of an engineering study as part of the design and development of a lean and agile construction system and in particular its supply chain component. This combines modular assembly with a postponement function to be tested on a case study project (not reported here), th...

Full description

Saved in:
Bibliographic Details
Main Authors: Peter F. Court, Christine L. Pasquire, Alistair G.F. Gibb, David Bower
Format: Default Article
Published: 2009
Subjects:
Online Access:https://hdl.handle.net/2134/9017
Tags: Add Tag
No Tags, Be the first to tag this record!