Modular assembly with postponement to improve health, safety, and productivity in construction
This paper presents the outcome of an engineering study as part of the design and development of a lean and agile construction system and in particular its supply chain component. This combines modular assembly with a postponement function to be tested on a case study project (not reported here), th...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Default Article |
| Published: |
2009
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/2134/9017 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|