Project procurement system selection model (with particular reference to Saudi Arabia)

In the last two decades there has been a significant change in the technical and economic conditions prevailing in the construction industry. The traditional methods of procuring projects are now inadequate to cope with these changes. To overcome the shortcomings of the traditional procurement metho...

Full description

Saved in:
Bibliographic Details
Main Author: Talal A. Al-Hazmi
Format: Default Thesis
Published: 1999
Subjects:
Online Access:https://hdl.handle.net/2134/7855
Tags: Add Tag
No Tags, Be the first to tag this record!