Buried pipe systems for irrigation in Bangladesh
A study of eight cement concrete buried pipe schemes in Bangladesh was carried out during 1989-91 to evaluate both technical and management performance. Leakage through joints and pipe walls, averaged 0.9 leaks per 100m of pipeline, while 42% of outlet valves were observed to leak. Conveyance losses...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Default Conference proceeding |
| Published: |
1992
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/2134/29034 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|