Piped water supply in a phased approach: a case study from Mozambique

A general assumption in the rural water supply sector is that investments should be made with a long time-frame and sustainability in mind. However, in reality it is difficult to access sufficient water and funds to build systems that can cater for rapidly growing small urban centres for the next 20...

Full description

Saved in:
Bibliographic Details
Main Authors: Lucrezia Biteete, Andreas G. Koestler, Gil Rodrigues Atiena
Format: Default Conference proceeding
Published: 2013
Subjects:
Online Access:https://hdl.handle.net/2134/30880
Tags: Add Tag
No Tags, Be the first to tag this record!